dinkstreet 125 Manuel atelier : Page 70

Microfiches
Image preview

Page 68

Image preview

Page 69

Image preview

Page 71

Image preview

Page 72

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 257
          5. ENGINE REMOVAL/INSTALLATION                      DOWNTOWN 125i

 ENGINE HANGER
 REMOVAL

 Remove the engine mount nut .
 Pull the engine mount bolt out.

 Be careful to put the engine down.
 Remove the left engine hanger mount bolt .
 Remove the right engine hanger mount bolt
 and collar .
 Remove the engine from frame.


 INSTALLATION

 Installation is in the reverse order of removal.

 Tighten the engine hanger mount bolts to the
 specified torque.(engine side)

 Torque: 5 kgf-m (50 N-m)

 Tighten the engine mount bolt/nut to the
 specified torque. (frame side)

 Torque: 5 kgf-m (50 N-m, 36 lbf-ft)




                                                            5-8