dinkstreet 125 Manuel atelier : Page 69

Microfiches
Image preview

Page 67

Image preview

Page 68

Image preview

Page 70

Image preview

Page 71

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 257
          5. ENGINE REMOVAL/INSTALLATION                      DOWNTOWN 125i

 INSTALLATION

 Installation is in the reverse order of removal.

 Tighten the engine mounting bolt/nut to the
 specified torque.

 Torque: 5 kgf-m (50 N-m)

 Tighten the right and left rear shock absorber
 lower mount bolts to the specified torque.

 Torque: 4.0kgf-m (40N-m)

 Install the rear brake caliper and tighten the
 mount bolts to the specified torque.

 Torque: 3.2 kgf-m (32 N-m, 23 lbf-ft)




 After installation, inspect and adjust the
 following:
 · Throttle grip free play
 · Fill the cooling system with coolant and
   start the engine to bleed air from the system.
 API/ABV Reset(Refer to chapter14 page 17)




5-7