14.HANDLEBAR/FRONT WHEEL/FRONT BRAKE/ FRONT SHOCK ABSORBER/STEERING STEM DINK 50/125 INSTALLATION Install the new bottom cone race onto the steering stem. Install the new upper and bottom ball races into the frame. Apply grease to the top and bottom ball races and install new 26 steel balls on the top ball race and 19 new steel balls on the bottom ball race. Install the steering stem. Apply grease to the top cone race and install it. Tighten the top cone race and then turn the steering stem right and left several times to make steel balls contact each other closely. Check that the steering stem rotates freely without vertical play. Install the steering stem lock nut and tighten it to the specified torque by using the special tool while holding the top cone race. Torque: 8 kgf-m (80 N-m, 58 lbf-ft) Special tool: Lock nut wrench A120F00002 14-31