5. ENGINE REMOVAL/INSTALLATION DINK 125 SERVICE INFORMATION GENERAL INSTRUCTIONS · A floor jack or other adjustable support is required to support and maneuver the engine. Be careful not to damage the scooter body, cables and wires during engine removal. · Use shop towels to protect the scooter body during engine removal. · Drain the coolant before removing the engine. · After the engine is installed, fill the cooling system with coolant and be sure to bleed air from the water jacket. Start the engine to check for coolant leaks. · Before removing the engine, the rear brake caliper must be removed first. Be careful not to bend or twist the brake fluid tube. SPECIFICATIONS DINK 125: Engine oil capacity: at disassembly: 1.1 L (0.968 lmp qt, 1.166 US qt) : at change: 0.9 L (0.792 lmp qt, 0.954 US qt) Coolant capacity: Radiator capacity : 1 liter (1.1 US qt, 0.88 lmp qt) Reserve tank capacity : 0.37 liter (0.4 US qt, 0.33 lmp qt) DINK 50: Engine oil capacity: at disassembly: 0.85 L (0.748 lmp qt, 0.901 US qt) : at change: 0.7 L (0.616 lmp qt, 0.742 US qt) TORQUE VALUES DINK 125: Engine mounting bolt/nut 5 kgf-m (50 N-m, 36 lbf-ft) Engine hanger mounting bolt 5 kgf-m (50 N-m, 36 lbf-ft) DINK 50: Engine mounting bolt/nut 4.5~5.5kgf-m (45~55 N-m, 32.4~39.6 lbf-ft) Rear shock absorber lower mount bolt: 2.4~3.0kgf-m (24~30 N-m, 17.28~21.6 lbf-ft) Engine hanger mounting bolt 4.5~5.5kgf-m (45~55 N-m, 32.4~39.6 lbf-ft) 5-1