people gt 125 i Manuel atelier : Page 55

Microfiches
Image preview

Page 53

Image preview

Page 54

Image preview

Page 56

Image preview

Page 57

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 209
          5. ENGINE REMOVAL/INSTALLATION                      People GT 125i


 Remove the engine mount nut
 Pull out the engine mount bolt.
 Remove the engine from the frame.

 At removing the engine, be careful not to
   catch your hand or finger between the
   engine hanger and crankcase.




 INSTALLATION

 Installation is in the reverse order of removal.

 Tighten the engine mounting bolt/nut to the
 specified torque.

 Torque: 5 kgf-m (50 N-m)

 Tighten the right and left rear shock absorber
 lower mount bolts to the specified torque.

 Torque: 4.0kgf-m (40N-m)

 Install the rear brake caliper and tighten the
 mount bolts to the specified torque.

 Torque: 3.2 kgf-m (32 N-m, 23 lbf-ft)




 After installation, inspect and adjust the
 following:
 · Throttle grip free play
 · Fill the cooling system with coolant and
   start the engine to bleed air from the system.
  API/ABV Reset(Refer to chapter14)




5-5