people gt 125 i Manuel atelier : Page 53

Microfiches
Image preview

Page 51

Image preview

Page 52

Image preview

Page 54

Image preview

Page 55

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 209
          5. ENGINE REMOVAL/INSTALLATION                             People GT 125i



 Loosen the rear axle nut.
 Support the scooter securely on its main stand.         Bolts

 Remove three bolts attaching to rear brake
 hose clamps.
 Remove the two bolts, then remove the rear
 brake caliper.




                                                   Regulator/Rectifier
 Disconnect the Regulator/Rectifier connector.
 Disconnect the ignition pulse generator
 connector.




 Release the rubber cap and remove the
 terminal screw to disconnect the start motor
 cable from the start motor.
 Remove the bolts and engine
 ground cable.




5-3