people gt 125 i Manuel atelier : Page 192

Microfiches
Image preview

Page 190

Image preview

Page 191

Image preview

Page 193

Image preview

Page 194

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 209
          17. IGNITION SYSTEM                                                         People GT 125i



 A .C. GENERATOR INSPECTION
 CRANK POSITION SENSOR INSPECTION

 This      test is performed with the stator
    installed in the engine.

 Remove the seat and met-in box.
 Disconnect the Crank Position Sensor Wire
 Coupler.
 Measure the resistance between the
 blue/white and green/white wire terminals.                Crank Position Sensor Wire Coupler
 Blue/YellowGreen/White           11515

 TILT SWITCH
 INSPECTION
 Support the scooter level surface.
 Put the side stand up and engine stop switch
 is at "RUN".
 Turn the ignition switch to "OFF".
 Remove the screws, washers and tilt switch.
Do      not disconnect the tilt switch
   connector during inspection.
   The capacity of battery must be fully
   charged.

 Place the tilt switch vertical as shown at the
 ignition switch "ON". Measure the voltage as
 below.
         Terminal                  Standard
 Violet/Red (+) ­
 Green/Pink (-)              5 V (ECU voltage)
 Black/Blue (+) ­                                      Tilt Switch      "UP" Mark
                             0.41.4 V less
 Green/Pink (-)

 Incline the tilt switch 6510 degrees to the left
 or right at the ignition switch "ON". Measure
 the voltage as below.

         Terminal                  Standard
 Violet/Red (+) ­
                             5 V (ECU voltage)
 Green/Pink (-)
 Black/Blue (+) ­
                             3.74.4 V
 Green/Pink (-)
 If repeat this test, first turn the ignition switch                 Connector
 to "OFF", then turn the ignition switch to "ON".

                                                                                    17-4