people gt 125 i Manuel atelier : Page 97

Microfiches
Image preview

Page 95

Image preview

Page 96

Image preview

Page 98

Image preview

Page 99

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 209
          8. DRIVE AND DRIVEN PULLEYS/
  KICK STARTER                                                                People GT 125i


                                                                         Apply grease
 DRIVEN PULLEY ASSEMBLY

 Clean any oil from the drive belt sliding
 surfaces on the driven face.

 Filling 12 g of grease to driven face inner
 side.




 Apply grease to lips of the new dust seals and
 install into the movable driven face.
 Coat new O-rings with grease and install
 them into the movable driven face grooves.

 Install the movable driven face onto the
 driven face.
 Install the guide rollers and guide roller pins.
 Filling 5 g of grease to each guide groove.

 Install the guide pins/rollers.                    Apply grease




 Install spring collar.
 Use the special tool to install spring and
 clutch, then install and tighten the nut to the
 specified torque.                                                 Lock Nut Wrench


 Torque: 5.5 ~6.5m (55~65N-m)

 Special tool:
 Clutch Spring Compressor          A120E00034




                                                                     Clutch spring compressor




                                                                                     8-16