vitality 50 2t 4t 1 Manuel atelier : Page 84

Microfiches
Image preview

Page 82

Image preview

Page 83

Image preview

Page 85

Image preview

Page 86

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260 265 270 273
          5. ENGINE REMOVAL/INSTALLATION                                                VITALITY 50

                                                                Bushings
 ENGINE HANGER BRACKET
 INSPECTION
 Inspect the stopper rubbers and bushings
 for damage and replace with new ones if
 necessary.




 ENGINE INSTALLATION                          Stopper Rubbers              Engine Hanger
 Install the engine in the reverse order of
 removal.

   Cables and wires should be routed
   properly.

 Torque Values:
 Engine mounting bolt : 4.55.5kg-m
 Rear shock absorber lower mount bolt:
                        2.43.0kg-m

 Perform the following inspections and
 adjustments after installation.
 · Throttle cable
 · Oil pump control cable ( 3-7)
 · Rear brake cable ( 3-2)
 · Oil pump bleeding ( 4-7)




5-5