vitality 50 2t 4t 1 Manuel atelier : Page 260

Microfiches
Image preview

Page 258

Image preview

Page 259

Image preview

Page 261

Image preview

Page 262

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260 265 270 273
          16. ELECTRICAL EQUIPMENT                                                  VITALITY 50

                                                               Bolts
 STARTER MOTOR REMOVAL
 Disconnect the starter motor cable.
 Remove the two bolts attaching the starter
 motor and remove the starter motor.

 The installation sequence is the reverse of
 removal.
 Connect the starter motor cable connector
 Check the O-ring for wear or damage and
 replace it if necessary.

 Apply grease to the O-ring and install the
 starter motor.
 Tighten the two mounting bolts.                    Starter Motor
 Torque: 0.81.2kgf-m

 The starter motor cable connector must
   be installed properly.




 STARTER MOTOR INSPECTION                      Starter Motor             Battery (+) Terminal
 Connect a battery across the starter motor
 and check for its operation.




                                                               Battery




16-19