vitality 50 2t 4t 1 Manuel atelier : Page 233

Microfiches
Image preview

Page 231

Image preview

Page 232

Image preview

Page 234

Image preview

Page 235

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260 265 270 273
          14. STEERING HANDLEBAR/FRONT WHEEL/FRONT
   BRAKE/FRONT SHOCK ABSORBER/FRONT FORK                                  VITALITY 50


 INSTALLATION
 Apply grease to top and bottom ball races
 and install 26 steel balls on the top ball race
 and 19 steel balls on the bottom ball race.
 Apply grease to the ball races again and
 then install the front fork.




 Apply grease to the top cone race and                      Lock Nut
 install it.
 Tighten the top cone race and then turn the
 steering stem right and left several times to
 make steel balls contact each other closely.
 Torque: 0.51.3kgf-m

   Check that the steering stem rotates
   freely without vertical play.




                                                     Top Cone Race

                                                         Lock Nut Socket Wrench
 Install the steering stem lock nut and
 tighten it while holding the top cone race.
 Torque: 6.08.0kgf-m
 SPECIAL TOOLS
 Lock nut socket wrench F007

 Install the handlebar. ( 14-3)
 Install the speedometer cable.




                                                   Top Con Race Wrench


14-21