agility 50 city 2t Manuel atelier : Page 153

Microfiches
Image preview

Page 151

Image preview

Page 152

Image preview

Page 154

Image preview

Page 155

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 171
          15. ELECTRICAL EQUIPMENT                                                AGILITY CITY 50 2T


 PERFORMANCE TEST
 Warm up the engine.
 Remove the floor mat and front tool box
 cover.

   Use a fully charged battery to check the
   charging system output.

 Stop the engine and open the fuse box.
 Disconnect the wire lead from the fuse
 terminal. Connect an ammeter between
 the wire lead and fuse terminal as shown.
 Connect the battery positive (+) terminal to
 the voltmeter positive (+) probe and battery
 negative (-) terminal to the voltmeter
 negative (-) probe.
 Start the engine, gradually increase engine
 speed to test the output:
       Position
                      Day             Night
 RPM
    2500           1.3A min.       1.0A min.
     6000          2.0A min.       2.0A min.


 Charging Limit Voltage: 14.50.5V/8000rpm
 If the limit voltage is not within the specified
 range, check the regulator/ rectifier.




 A.C. GENERATOR (CHARGING COIL)
 INSPECTION
                                                    A.C. Generator Connector

   Inspect with the engine installed.

 Remove the met-in box. ( 12)
 Disconnect the A.C. generator connector.
 Measure the resistances between the
 charging coil terminals (white­green) and
 lighting coil terminals (yellow­green).
 Resistances:
 Charging coil white­green 0.42
 Lighting coil yellow­green 0.32

 Refer to 7-3 for A.C. generator removal.




15-5