agility 50 city 2t Manuel atelier : Page 166

Microfiches
Image preview

Page 164

Image preview

Page 165

Image preview

Page 167

Image preview

Page 168

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 171
          16. INSTRUMENT/SWITCHES/LIGHTS                                    AGILITY CITY 50 2T

                                                                 Horn Terminal


 HORN INSPECTION
 Remove the frame front cover.
 Disconnect the horn wire couplers. The
 horn is normal if it sounds when a 12V
 battery is connected across the horn wire
 terminals.




                                                   Instruments

 INSTRUMENTS
 Remove the handlebar front cover.
 Remove the handlebar rear cover.
 Disconnect the handlebar switch couplers.
 Remove the three screws to remove the
 instruments.
 Install a new horn in the reverse order of
 removal.



                                                                     Screws

 HEADLIGHT                                      Screw
                                                                     Front Cover
 REMOVAL
 Remove the screw on the front cover.
 Remove the two screws on the back of the
 front cover.
 Remove the front cover.




 The installation sequence is the reverse of
 removal.


   · Align the tab on the headlight with the
     groove on the handlebar cover.
   · After installation, adjust the headlight
     beam.



16-7