9. FINAL REDUCTION Downtown 300i ABS Dowel Pin FINAL REDUCTION ASSEMBLY Install the drive shaft into the left crankcase. Put the final gear on the left crankcase. Install the countershaft and gear into the left crankcase. Install the final shaft into the final gear and transmission case. Install the dowel pins and a new gasket. Countershaft Final Gear Install the transmission case cover. Install and tighten the transmission case cover bolts. Install the clutch outer/driven pulley. Install other removed parts in the reverse order of removal. Torque: Transmission case bolt 0.8-1.2 kgf-m (9.8 N-m) After installation, fill the transmission case with the specified oil. Transmission Case Cover · Place the scooter on its main stand on level ground. · Check the oil-sealing washer for wear or damage. Specified Gear Oil: SAE90# Oil Capacity: At disassembly : 0.23 liter At change : 0.21 liter Install and tighten the oil check bolt. Torque: Oil filler/drain bolt 1.8-2.2 kgf-m (19.7 N-m) Start the engine and check for oil leaks. Check the oil level from the oil check bolt Drain Bolt (under) Oil filler Bolt hole and add the specified oil to the proper level if the oil level is low. 9-5