5. ENGINE REMOVAL/INSTALLATION SUPER 9 50 ENGINE HANGER BRACKET Engine Hanger INSPECTION Inspect the stopper rubbers and bushings for damage and replace with new ones if necessary. Bushings Stopper Rubbers ENGINE INSTALLATION Install the engine in the reverse order of removal. Cables and wires should be routed properly. Torque Values: Engine mounting bolt : 44.153.9N-m Rear shock absorber lower mount bolt: : 23.529.4N-m Perform the following inspections and adjustments after installation. · Throttle cable · Oil pump control cable ( 4-2) · Rear brake system ( 3-11) · Oil pump bleeding ( 4-4) 5-4