13. DRIVE TRAIN                                              MXU 500IRS


 INSTALLATION

 Install the front drive case into the frame.

 Install and tighten the two mounting
 bolts/nuts to the specified torque.

 Torque: 4 kgf-m (40 N-m, 29 lbf-ft)




 Install the front propeller shaft.




                                                 Front Propeller Shaft




 Connect all wire connectors and then install.




13-13