5. ENGINE REMOVAL/INSTALLATION                      K-XCT 125i


 INSTALLATION

 Installation is in the reverse order of removal.

 Tighten the engine mounting bolt/nut to the
 specified torque.

 Torque: 5 kgf-m (50 N-m)

 Tighten the right and left rear shock absorber
 lower mount bolts to the specified torque.

 Torque: 4.0kgf-m (40N-m)

 Install the rear brake caliper and tighten the
 mount bolts to the specified torque.

 Torque: 3.2 kgf-m (32 N-m, 23 lbf-ft)




 After installation, inspect and adjust the
 following:
  Throttle grip free play
  Fill the cooling system with coolant and
   start the engine to bleed air from the system.
 API/ABV Reset.




5-7