5. ENGINE REMOVAL/INSTALLATION GRAND DINK 125/150 ENGINE INSTALLATION Install the engine in the reverse order of removal. Tighten the engine mounting bolts. Torque: 49N-m Engine Hanger Bolt Rear Shock Absorber Upper Mount Bolts Tighten the rear shock absorber upper mount bolts. Torque: 39.2N-m After installation, inspect and adjust the following: · Throttle grip free play ( 3-3) · Fill the rear brake reservoir with brake fluid and bleed air from the rear brake. · Fill the cooling system with coolant and start the engine to bleed air from the system. 5-5