grand dink 125 mmc 1 Manuel atelier : Page 65

Microfiches
Image preview

Page 63

Image preview

Page 64

Image preview

Page 66

Image preview

Page 67

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 249
          5. ENGINE REMOVAL/INSTALLATION                                           GRAND DINK 125/150



 ENGINE INSTALLATION
 Install the engine in the reverse order of
 removal.
 Tighten the engine mounting bolts.
 Torque: 49N-m




                                                    Engine Hanger Bolt
                                                      Rear Shock Absorber Upper Mount Bolts
 Tighten the rear shock absorber upper mount
 bolts.
 Torque: 39.2N-m
 After installation, inspect and adjust the
 following:
 · Throttle grip free play ( 3-3)
 · Fill the rear brake reservoir with brake fluid
   and bleed air from the rear brake.
 · Fill the cooling system with coolant and
   start the engine to bleed air from the
   system.




5-5