dinkstreet 125 Manuel atelier : Page 81

Microfiches
Image preview

Page 79

Image preview

Page 80

Image preview

Page 82

Image preview

Page 83

1 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 257
          6. CYLINDER HEAD/VALVES                                               DOWNTOWN 125i



 INSTALLATION                                    Punch Marks


 Turn the A.C. generator flywheel so that the
 "T" mark on the flywheel aligns with the
 index mark on the crankcase.
 Keep the round hole on the camshaft gear
 facing up and align the punch marks on the
 camshaft gear with the cylinder head surface
 (Position the intake and exhaust cam lobes
 down.) and install the cam chain onto the
 camshaft gear.
                                                Round Hole               Cam shaft




 Install the rocker arms shafts fixed bolt .




                                                               Bolt




Install the camshaft gear                                              Camshaft Gear




                                                                                 6-10